In the time period of 1 days from November 18, 2024, the data shows plasterlodzki.pl underwent 2 operability checks. On November 19, 2024, plasterlodzki.pl was confirmed up for the 2 time from all assessments conducted, by a 200 status code. As of November 19, 2024, there were no periods of inactivity for plasterlodzki.pl throughout all checks. It was noted from the responses received that there were no error statuses recorded as of November 19, 2024. Plasterlodzki.pl, on November 19, 2024, responded in 1.892 seconds, differing from its average of 1.915 seconds.